Begin typing your search above and press return to search.
proflie-avatar
Login
exit_to_app
Trump
access_time 22 Nov 2024 2:47 PM GMT
election commmission
access_time 22 Nov 2024 4:02 AM GMT
Champions Trophy tournament
access_time 21 Nov 2024 5:00 AM GMT
The illness in health care
access_time 20 Nov 2024 5:00 AM GMT
The fire in Manipur should be put out
access_time 21 Nov 2024 9:19 AM GMT
America should also be isolated
access_time 18 Nov 2024 11:57 AM GMT
DEEP READ
Munambam Waqf issue decoded
access_time 16 Nov 2024 5:18 PM GMT
Ukraine
access_time 16 Aug 2023 5:46 AM GMT
Foreign espionage in the UK
access_time 22 Oct 2024 8:38 AM GMT
exit_to_app
Homechevron_rightBusinesschevron_rightRailways cancels...

Railways cancels tender for manufacturing 44 Vande Bharat Express rakes

text_fields
bookmark_border
Railways cancels tender for manufacturing 44 Vande Bharat Express rakes
cancel
camera_altRepresentative image

New Delhi: Indian Railways on Friday cancelled the tender for the manufacturing of 44 rakes of Train 18, which has been re-christened as Vande Bharat Express, and said a fresh tender will be floated within a week's time, focusing on Make in India as a Chinese Joint Venture also applied as a foreign bidder.

The Ministry of Railways in a statement said: "Tender for manufacturing of 44 sets of semi high-speed train set (Vande Bharat) has been cancelled."

"A fresh tender will be floated within a week as per revised public procurement (Preference to Make in India) order," it added.

The decision came after the Chinese joint venture company CRRC Pioneer Electric (India) Private Limited emerged as the only foreign bidder for the global tender floated for manufacturing 44 rakes of Vande Bharat trains.

The Chennai-based ICF has invited bids for procurement of electric traction kits for Train 18, the country's first self-propelled train without locomotives.

Train 18 was manufactured by ICF, which is owned by the Indian Railways, with over 80 per indigenous materials and was rolled out in October 2018 amidst much fanfare.

The train was later re-christened as Vande Bharat express and was introduced between New Delhi and Varanasi, Prime Minister Narendra Modi's parliamentary constituency, in February last year. In October last year, the second Vande Bharat Express train was introduced between New Delhi and Katra.

In November 2019, the railway board gave a go-ahead to ICF to resume manufacturing of the semi high-speed trains. Subsequently, the ICF had called for bids for procuring electric traction kits for 44 train sets. Each set of trains has got 16 coaches.

In December last year, Indian Railways had planned to complete the production of 44 more new rakes on India's 75th Independence day. All the coaches of Vande Bharat Express have a stainless steel car body equipped with automatic doors with sliding footsteps, on-board computers for train control and remote monitoring. The coaches also have a GPS-based audio-visual passenger information system, on-board hotspot WiFi and comfortable seating arrangements.

Show Full Article
TAGS:#Modi#Railway#Vande Bharat#CRRC
Next Story