ISRO has confirmed that all systems on the Chandrayaan-3 spacecraft are functioning "perfectly."
Considering the smooth run of all parameters so far, landing is more likely to happen as scheduled on Wednesday evening
He was one of the leading physicists and astronomers to have worked on the project with which Russia hoped to revive its...
It further said that measures that had been taken on August 19, and 20 to reconnect with the lander were not successful
The lander, named Vikram, has positioned itself in an orbit with its closest point to the Moon at 25 km and the farthest...
The LI Camera-1 also captured images of the Harkhebi crater, with an approximate diameter of 43 km.
The spacecraft is now expected to land on the Moon on August 23. After landing, the lander Vikram will photograph the...
The proximity of their landing dates—August 21–23 for Luna-25 and August 23–24 for Chandrayaan-3—and any potential...
The separation of the lander module from the propulsion module of the spacecraft is scheduled for August 17.
On attaining the required orbit, the lander will get separated from the propulsion module and later will be expected to...
The spacecraft will begin a deboost procedure once it reaches final orbit, slowing down before the lander module...
After landing, Chandrayaan-3 is expected to operate for one lunar day, which is equivalent to approximately 14 Earth...
On August 1, Chandrayaan-3 completed orbiting around the Earth and headed towards the moon. On that day. a successful...
"Next stop: the moon. As it arrives at the moon, the Lunar-Orbit Insertion (LOI) is planned for August 5, 2023."