Begin typing your search above and press return to search.
proflie-avatar
Login
exit_to_app
election commmission
access_time 22 Nov 2024 4:02 AM GMT
Champions Trophy tournament
access_time 21 Nov 2024 5:00 AM GMT
The illness in health care
access_time 20 Nov 2024 5:00 AM GMT
The fire in Manipur should be put out
access_time 21 Nov 2024 9:19 AM GMT
America should also be isolated
access_time 18 Nov 2024 11:57 AM GMT
Munambam Waqf issue decoded
access_time 16 Nov 2024 5:18 PM GMT
DEEP READ
Munambam Waqf issue decoded
access_time 16 Nov 2024 5:18 PM GMT
Ukraine
access_time 16 Aug 2023 5:46 AM GMT
Foreign espionage in the UK
access_time 22 Oct 2024 8:38 AM GMT
exit_to_app
Homechevron_rightIndiachevron_rightUttarakhand tunnel...

Uttarakhand tunnel collapse: rescuers drill over halfway to trapped workers

text_fields
bookmark_border
Uttarakhand tunnel collapse: rescuers drill over halfway to trapped workers
cancel

Uttarkashi: Drilling with the American auger machine resumed at the Silkyara tunnel overnight to prepare an escape passage for the 41 workers trapped inside for more than 10 days, officials said on Wednesday.

According to officials, 800 mm diameter steel pipes have been inserted up to 39 metres through the rubble, with another 14 metres to go before the rescuers reach the trapped labourers.

Once the drilling is complete, the passage will be used to evacuate the labourers from the tunnel.

"We have pushed in the pipes up to 39 metres by now. Everything is fine. I have spoken to them (trapped workers). Their morale is high," former advisor to the PMO Bhaskar Khulbe told reporters in Silkyara.

Also Read:Workers trapped in Uttarkashi tunnel seen for first time using endoscopy camera

Asked to spell out a timeline for the evacuation, he said, "We hope to celebrate Igas with them". Igas is a festival celebrated in the Garhwal region after Diwali. It will take place on Thursday.

The drilling was suspended since Friday when the auger machine hit a hard object. But the resumption is likely to speed up the rescue efforts, officials said.

NHIDCL officials supervising the rescue operations on the spot had on Tuesday said the auger machine will be put back into operation after the 800 mm diameter steel pipes are pushed through the 900 mm diameter steel pipes already laid through the rubble using the telescopic method.

Prime Minister Narendra Modi talked to Chief Minister Pushkar Singh Dhami once again on Wednesday morning to take updates on the rescue operations underway at the tunnel and food and other essentials including medicines being supplied to the trapped workers through a new wider pipeline laid for the purpose.

It was through this new pipeline that the first visuals were captured of the trapped workers early on Tuesday with the help of an endoscopic flexi camera sent beyond the rubble.

Dhami briefed the Prime Minister about the positive progress made over the last 24 hours in the rescue efforts being carried out at the tunnel with coordination between the state government, the central agencies and the international tunnelling experts.

"We are getting continuous guidance from the Prime Minister in this difficult situation. It provides us with a new energy every day to evacuate our trapped brothers safely at the earliest applying all our strength," Dhami said on X.


With inputs from PTI

Also Read:Silkyara tunnel: Focus on horizontal drilling to rescue workers


Show Full Article
TAGS:India NewsUttarakhand Tunnel CollapseSilkyara tunnel
Next Story