Begin typing your search above and press return to search.
proflie-avatar
Login
exit_to_app
The future of the INDIA bloc
access_time 12 Feb 2025 10:46 AM IST
America against global justice
access_time 10 Feb 2025 10:30 AM IST
Delhis result and AAPs future
access_time 9 Feb 2025 10:32 AM IST
Amidst evident distress, Plan B is a must
access_time 8 Feb 2025 10:00 AM IST
DEEP READ
Munambam Waqf issue decoded
access_time 16 Nov 2024 10:48 PM IST
Ukraine
access_time 16 Aug 2023 11:16 AM IST
The Russian plan: Invade Japan and South Korea
access_time 16 Jan 2025 3:32 PM IST
Putin
access_time 2 Jan 2025 1:36 PM IST
What is Christmas?
access_time 26 Dec 2024 11:19 AM IST
exit_to_app
Homechevron_rightSciencechevron_rightISRO conducts 1st hot...

ISRO conducts 1st hot test of Gaganyaan service module propulsion system

text_fields
bookmark_border
ISRO conducts 1st hot test of Gaganyaan service module propulsion system
cancel

Chennai: Indian Space Research Organisation (ISRO), successfully conducted the first hot test of the System Demonstration Model of the Gaganyaan Service Module Propulsion System on Saturday.

According to the space agency, the hot test was conducted for a duration of 450 seconds at the ISRO Propulsion Complex (IPRC) in Mahendragiri, Tamil Nadu.

"The system performance met the test objectives and there was a close match with the pre-test predictions. Further, a series of hot tests are planned to simulate various mission conditions as well as off-nominal conditions," ISRO said.

The Service Module is part of the Gaganyaan Orbital Module and is located below the crew module and remains connected to it until re-entry.

The Service Module Propulsion System consists of a unified bipropellant system comprising five 440 N thrust engines and 16 100 N Reaction Control system (RCS) thrusters with MON-3 (mixed oxides of nitrogen) and MMH (monomethylhydrazine) as oxidizer and fuel, respectively.

The System Demonstration Model, consisting of five 440 N engines and eight 100 N thrusters, was realised to qualify the propulsion system performance on the ground.

Meanwhile, a new test facility has been established at IPRC, Mahendragiri, for testing the System Demonstration Model.

Show Full Article
TAGS:ISROTNGaganyaan service module propulsion system
Next Story